Contractor document guide · Side-by-side

One assigns the work. One changes the deal.

A work order usually sends authorized work into the field. A change order modifies what the parties previously agreed. Many jobs need both, in that order.

  • 11 minute read
  • Updated July 10, 2026
  • Document selection
A scheduled exterior-door work order sits beside dispatched materials while JobSign documents newly discovered sill repair as a priced change.
Two paths 01 Dispatch approved work; amend changes before redispatch.

The short answer

Classify the document by effect, not title.

A work order typically answers: who goes where, when, to do which already-approved task, under what site and pricing rules, and what must be recorded at closeout.

A change order answers: what in the original agreement is being added, deleted, or replaced, and how does that affect price, payment, time, risk, and authorization? Organizations use names differently, so read the governing agreement and actual content.

Comparison matrix

Different triggers, different authority.

Purpose

Work order: execute

Starts, assigns, schedules, tracks, or closes approved work.

Change order: modify

Amends agreed scope, price, payment, time, or another term.

Trigger

Work order: ready work

Approved estimate, recurring service, contract task, repair request, or planned visit.

Change order: changed deal

Customer request, discovery, design/inspection revision, quantity, deletion, substitution, or delay effect.

Relationship

Work order: under authority

References the contract, estimate, approval, master agreement, or standing service terms.

Change order: changes authority

Becomes part of or modifies the original agreement through its change process.

Money

Work order: applies pricing

Uses approved fixed, unit, T&M, diagnostic, or NTE rules and tracks actuals.

Change order: revises pricing

Adds and subtracts work, credits, adjustments, revised total, payment, and potentially time.

Signatures

Work order: role-dependent

Dispatcher, lead, technician, and customer acknowledgement vary by workflow.

Change order: modification authority

Requires the parties or representatives authorized under agreement and law to approve the amendment.

Closeout

Work order: field result

Labor, parts, tests, evidence, status, exceptions, follow-up, and completion acknowledgement.

Change order: approved baseline

Executed amendment and attachments retained with the controlling contract and reflected in downstream records.

Lifecycle

Use the change order before the revised work order.

  1. 01

    Agreement or estimate is approved

    The customer and contractor establish the original scope, price, schedule, and governing terms.

  2. 02

    Work order dispatches the task

    The field receives site, scope, assignment, access, pricing, safety, materials, and closeout requirements.

  3. 03

    A changed condition or request appears

    The field documents the trigger and stops at the authorization boundary.

  4. 04

    Change order amends the agreement

    Authorized parties approve changed scope, additions/credits, payment, schedule, exclusions, and evidence.

  5. 05

    Revised work order returns it to the field

    The newly approved work becomes an executable assignment with current attachments and limits.

  6. 06

    Closeout records actual performance

    The field documents what was completed under both the original and changed authority.

Which document?

Five common field decisions.

Work order

Dispatch an approved faucet replacement

Scope and fixed price are already accepted. Assign technician, access window, specified faucet, protection, test, and closeout evidence.

Change order

Customer upgrades the faucet after ordering

Replace the product decision, address return/restocking, changed price, lead time, payment, and signature before new order.

Both

Rot is discovered behind planned siding repair

Change order approves framing/sheathing repair and effects; revised work order gives crew the new boundary, materials, safety, and evidence.

Work order

Perform recurring quarterly maintenance

The service agreement already defines tasks and rates. Each visit is scheduled, assigned, and closed through a work order.

Change order

Owner deletes one room from a painting contract

Amend deleted scope, committed cost, credit, revised total, payment, and schedule. Then update crew work orders.

Four-question selector

Choose by what the record does.

01

Does it alter agreed scope?

If yes, use the required change or amendment process.

02

Does it change money or time?

If yes, update price, payment, schedule, and authority, not just field notes.

03

Is the work already authorized?

If yes, a work order may assign and track execution under that authority.

04

Will the field need a new assignment?

After approval, issue or revise the work order so execution matches the amended agreement.

Signature meaning

Do not reuse one signature label.

The signature block should state what the signer is doing. A customer acknowledgement at closeout is not automatically approval of added scope.

Record roleSignature effect
Work-order issuance
[Dispatcher/manager assigns the described authorized work to the named field person]
Field acknowledgement
[Technician/crew lead confirms receipt and review of assignment, site information, and known controls]
Customer work authorization
[Authorized customer approves only the stated work and pricing under identified governing terms]
Customer completion acknowledgement
[Confirms stated site facts, demonstration, or completion; define whether it authorizes billing]
Change-order approval
[Authorized party agrees to amend identified scope, price, payment, schedule, and attachments]

Document labels do not override the agreement or law. Define the signer's capacity, authority, intent, and the exact version signed.

Research basis

The clean distinction is execution versus modification.

FAR Part 43 expressly excludes orders for supplies or services that do not otherwise change contract terms from its contract-modification rules, while FAR 43.2 treats change orders as written contract changes within authorized areas. That federal system is not a residential rule, but it illustrates the conceptual boundary.

Oregon procurement guidance says change orders can alter tasks, standards, methods, price, or schedule and must follow the original contract’s change provisions. GSA facilities guidance treats work orders as operational records carrying description, resolution, timestamps, notes, labor, costs, closeout, and barriers. California and Oregon residential guidance reinforce that changed contract scope should follow the applicable written change process.

Change order vs. work order questions

Can a work order change the contract?

A document may have contractual effect based on its content and governing terms, but ordinary dispatch should not bypass the required amendment process.

Do both documents need customer signatures?

Not always. Change approval requires authorized agreement modification; work-order issuance may be internal. State the purpose and signer authority.

Can the same software record serve both functions?

Possibly, if it clearly separates the document type, authority, content, version, signatures, and workflow required for each function.

What happens after a change order is signed?

Retain it with the contract, update price/payment/schedule records, and issue a current field assignment or revised work order.

Right record, right moment

Approve the change, then dispatch the work.

Use JobSign for customer-facing scope changes and clear work authorizations before the field moves.